The clinker roll crusher is a primary component to drive the grate motor, it is mainly composed of cylinder body, roller, speed measuring device and the transmission. The roller crusher has several rollers, each is installed with a roller shell. And it is easy to extract each roller to change the roller shell. Furthermore, every roller is drive by a helical gear motors with a planetary reducer.
Roll Crushers are compression type crushers, and were once widely used in mining. They have, within the last 10 or so years,
crushing equipment Manufacturers fallen into dis-favor among mining and processing companies. The probable reason is because the large mines require very large crushed product output with minimal cost, makes the roll crusher uncompetitive. The roll crushers are not nearly as productive as cone crushers, with respect to volume, and they do have a little higher maintenance associated with them. Roll crushers do, however, give a very close product size distribution, and if the ore is not too abrasive, they do not have high maintenance costs.
After checking up and repairing the parts, we can assemble all the components into a whole cone crusher. Take the spring cone crusher as an example, the installation procedures are as follows: first, install the rack,
Hydraulic Cone Crusher and then install the transmission shaft, eccentric sleeve, bearing base, moving cone, dustproof device and lubrication device. After the above-mentioned devices installed, run the machine without load to check up whether it meets the requirements. Then, install the adjustment device, locking spring, feeding device and hydraulic station. Finally, operate the machine both re-load and no-load.
The rack is the main body of crusher with all parts in it,
Hydraulic Cone Crusher Manufacturers so it can directly affect the running of entire crusher. The rack must be installed firmly and correctly. The installation of cone crusher rack is similar with the cycle crusher. Before demolishing the old rack, we should measure the central location and elevation of old crusher, and the elevation of new rack should be less than 2mm. the new rack elevation should be no less than the old rack elevation, or above 1.5mm. Before installing the new rack, please clear the second water layer, and then sit it down the base with plate in the bottom in order to adjust the levelness of the crusher.